Showing posts with label Industry. Show all posts
Showing posts with label Industry. Show all posts

Saturday, December 25, 2010

China, returned to Turkey to leave the European textile industry, export earnings shrank 8 points

2009 all over the world with global crisis 'in amazement as' passed. This period of confusion the main export market of European countries, China, Turkey, leaving the proximity and flexibility of re-discovered. Approaching 10 percent in 2010 increased by 14.5 billion dollars, while exports of readymade garments and textile exports to $ 7 billion endured. But profit fell 8 points.

More than 20 percent of Turkey's total exports of more than $ 100 billion apparel industry, apparel, textile and leather products has. Also prominent in employment sectors in 2010 compared to 2009, spending much more successful year in 2011, and began to uphold the objectives. Significant increases in 2010, affecting the sectors in question, along with global crisis 'in amazement as' re-discovered in 2009, was instrumental in Turkey's main export markets. Turkey re-discovered in close proximity. Re-discovered the power of flexible manufacturing. Small-volume orders kıvırmadığı re-turned nose. Far East (China) and the increase in employee expenses as well as energy and economic development in those countries reduced the difference in cost between the positive impact of this re-discovery process. Contraction in the world economy in 2009, resulted in a decrease in Turkey's exports, while the recovery in 2010, showed himself thoroughly. If the sector say the biggest 'reduction in profitability' was. There are 8 points decline in profitability compared to the previous year.

There was a double spring

In 2010, the recovery gained momentum in the spring well. More rapid return to production lines, capacity utilization rates began to rise. False spring startled almost double for the sector began to take place the spring. Manifested itself in increasing employment, orders and capacities.

Luxury production increased

Previously foreign purchasing groups provide significant supply from Turkey in 2010, the route turned back to Turkey. In previous years, people who have small amounts of production has increased the production of luxury brands in Turkey. Production costs in Europe are relatively more favorable to Turkey in this shift was effective. Turkey pulled production on the one hand from the Far East and Europe on the one hand. This situation is expected to continue in a stable manner. Especially for luxury brands to do more production in Turkey's future is certain.
Everything is in fact not so rosy. If you need a little touch on the odds, the industry's complaints of low exchange rate continuing. Tax on production, energy and employee costs in 2010 also made the requested corrections. One other major risk before the IMF and the European Union after Greece had to recover to remain in Ireland. Dragging the name of a possible crisis is expressed in other European countries. Future crises in the region held 80 percent of exports in the sector, captured the positive growth in 2010 is taking the risk.

Exports increased by only 8 per cent of imports and 33 per cent

Clothing Manufacturers Association of Turkey (TGSD) Chairman Cem Negrin, for the year 2010 made the following reviews: "Turkey is ready to wear in 2009, has spent £ 37 billion of products such as shoes. £ 44 billion spent all of 2010 increased by 20 percent. Turkey's domestic market grew by 10 per cent in 2011 to TL 50 billion waiting for emergence. Apparel exports in 2010 increased by 8 per cent, in 2011, this ratio can take place between 6-8 percent. On the other hand 33 per cent increase in imports in 2010 was $ 3 billion. Against $ 4 billion in 2011. Industrial production was increased by 8 percent. Under Service Apparel sector employment as of the end of September of 2010 reached 376 thousand. At the end of the year, this figure would be 380 thousand people. In 2011 is 390 thousand people. But the sector, forcing reduction of 24 points in profitability since 2007. "

Product of more than 180 country Turkey is going to

Turkey, the United States and Russia, Romania, Kazakhstan, Tunisia, and between 60-123 percent increase in markets like Iran provided. Alternative markets apparel and garment exports in 2011 are expected to increase with. Clothing and apparel exports from Turkey are more than 180 countries.

Textile 'cotton' in a year such as

Memorizes a year in terms of sectors, is reminiscent of 2010 disrupted the Istanbul Textile and Raw Materials Exporters Association (İTHİB) President Ismail Shot, 4 dollars for the first time coming on 140 years of cotton, the environment, industry capacity utilization rate exceeds 80 percent, he said. Shot emphasizing the achievement of the pre-crisis days in terms of employment "in terms of export figures reached pre-crisis period. Closing in 2010 exports of $ 6.6 billion. All these positive developments and objectives of the Central Bank's last interest rate cut operation in 2011 enabled us to revise upwards. An increase of 25 per cent in 2011 aiming to export $ 8 billion. "

2011 high expectations for the first time in 2008 will be passed

İSTANBİL Clothing and Apparel Exporters' Association (IHKIB) President Hikmet Tanriverdi, January-November period of 2010 apparel and garment exports increased by 9.3 percent over the same period of last year was 13.2 billion dollars, 14.5 billion dollars in the year turn on exports, he said. Turkey's top 5 market in Germany, Britain, France, Spain and Italy have not changed indicating Tanriverdi, made the following assessment: "in 2008 to $ 15.7 billion in the process ulaşılamasa positive progress. Clothing and apparel exports in 2011 to 17 billion dollars a year waiting for emergence. However this figure to reach the height of production costs and the pressure of hot money on the exchange rate on the export sector need to lighten the negative impacts. "

Feed Industry Association with the Directorate General of Turkey's first privatized personnel old tradition in Ankara Done Gathering (video)

Feed Industry Association of Turkey General Directorate of the first privatized former Personnel Traditional Hale Brought a meeting in Ankara Completed This Year

Feed Industry Directorate General of Turkey, the first company privatized become a tradition brought by the former staff had to meet in Ankara this year. Employees of the General Directorate of Feed Industry in 1994 özelleştirilince other institutions charged with public institutions. Feed Industry professionals can not find the old parts of the new business environment in the institution each year since 1995, began to gather in a different place.

Feed Industry dinner held this year, the General Directorate of Social Facilities TEDAS last Yalcin Demir, general manager, as well as the entire management team and joined the staff.

Shared memories of organizing the night Ghazi Steel, most staff had met memuriyetle Feed Industry Directorate General, said it was like a family working together at that time. Steel said they would continue meeting until the end of their lives.

Tuesday, December 21, 2010

INDUSTRY MAH.KİRALIK SHOP

150 METERS ON THE STREET NEAR BENZİNLİĞE District Sultan Selim INDUSTRY MARKET Deli SOHWROOM USED AS A SHOP FOR RENT
DETAILS
Business Type Store Department / Room Number 1
Number of Floors 5 Level Ground Floor
20 Age of Building Heating Type None
Condition of the Free State of Second Hand Use
1500 USD Deposit

Intended Use
Bank Shop Gallery / Showroom
Cafe - Bar Store Market
Office Bakery

Interior Features

* Data Line
* Fax, Phone Line
* Industrial Electricity
* WC


Exterior Features

* Parking -


Location

* Center
* The front facade

FOR SALE 3 +1 APARTMENT INDUSTRY MAH.DE

STREET AND SULTAN SELIM INDUSTRIAL District GUMUSHANE Street Highway MASS TRANSPORT TO SCHOOL VERY CLOSE TO NEAR EARTH Deed sold 3 +1 APARTMENT 115 SQUARE METERS
DETAILS
Housing Type Apartment Number of Floors 4
Age of the Building Level 4 25
Combined Fuel Type Gas Heating Type
Structure Type Reinforced Concrete Structure of the State Second Hand
Owner lives in the user status is not appropriate for credit eligibility
Rent Income £ 700 South Front Side Options


Interior Features

* Steel Door
* Shower
* Cable TV-Satellite
* Papier
* Paving
* Ceramic Tiles


Exterior Features

* Mosaic Glass Coating
* Thermal Insulation
* PVC windows


Location

* Close to Main Street
* View - City
* Center
* Close to Highway
* The front facade
* Public Transportation

Saturday, December 18, 2010

Announcement of the Ministry of Industry and Commerce Contract Personnel Retrieval (107 engineers)

Ministry of Industry and Commerce, Universities Faculties of Engineering machinery, construction, electrical, electronic, electrical and electronics, industrial and computer engineer degree in Contractor will be 107.

NO 657 PUBLIC OFFICERS LAW 4 / B, ACCORDING TO ARTICLE WILL BE Contracted Personnel to be employed.

"657sayılı Civil Servants Law 4 / B, the provision of Article" and "Principles of Contract Employees to Run" to run on a contractual basis within the framework of provincial administration under the Ministry of Industry and Commerce Provincial Directorates of the following (107) the position of each contracted staff, written and / or oral examination without KPSS (B) group on the basis of ranking points, the placement will be made by our Ministry.

A) ADAYLARDA corresponding QUALIFICATIONS AND REQUIREMENTS

1) to be a Turkish citizen,

2) lacking deprived of public rights,

3) the periods specified in Article 53 of Turkish Penal Code, even if in the past, intentionally committed an offense for a period of one year or more imprisonment, or been pardoned, even crimes against state security, crimes against the constitutional order and the functioning of this order, national defense against crimes, crimes against state secrets and espionage, embezzlement, extortion, bribery, theft, fraud, forgery, breach of trust, fraudulent bankruptcy, Corruption in procurement, fulfillment deed Corruption, crime, money laundering or the proceeds obtained from the crimes of smuggling, not to be condemned.

4) As of his military status, lacking interest in military service or military service who have not reached the age of recruitment in the active duty military service Or, be made or deferred, or back to previous classes,

5) Without prejudice to the provisions of Article 53 of Law No. 657 with a mental illness that may prevent the continuous task of lacking,

6) Universities, Engineering Fakültelerininmakine, construction, electrical, electronic, electrical and electronics, industrial and computer parts to graduate,

7) (B) group of 10 to 11 July of 2010 we made to positions in Public Personnel Selection Examination (KPSS) points of type a minimum of P3 (70) and take over the points,

8) The deadline for applications as (30) being below the age,

B) APPLICATION FORM, PLACE, TIME AND OTHER MATTERS

1) Applications; 23:59 pm on Dec. 20, 2010 at the latest up to, the Ministry released the official web site (www.sanayi.gov.tr.) Filling out the application form completely and accurately in electronic form will be sent to the Ministry. The applications will be accepted in person or by mail and will not be processed.

2) will be stored in electronic form by taking the output of the application form filled out, the results were announced after the candidates are placed in the ministry will submit the application form signed and a photo.

3) Declared a maximum contract staff positions (2) of the Provincial Directorates for the position or positions may be preferred.

4) Each of the Provincial Directorates of contract staff positions (2) times the replacement candidate will be determined.

5) Placement results, the official website of the Ministry (www.sanayi.gov.tr.) Is to be announced, noble or placed on reserve as well as notification will be made to candidates.

6) Find what the conditions do not have the applications of candidates with qualifications and misrepresentation of those applications will not be accepted by the general provisions and the rights of legal action will be taken.

7) our Ministry will begin a new task of Engineers contracted monthly gross wage was £ 2,103.00, £ 476.42 per month with a net cost approximately an additional payment is $ 1,895.17. (Except for family benefits)

C) PROCEDURE FOR EVALUATION AND PLACEMENT

1) Duration of placement of candidates in the applicant and provide the necessary conditions, the Provincial Directorates of Industry and Commerce announced their preferred position without taking into consideration the high points by the number of engineering majors will be started to be provincial.

2) points, respectively, in the case of equality to those who graduate degree, graduates before graduation as of the date, it is the same age as the larger one will be given priority.

3) replacement candidates as of the date of appointment was announced rights placement results are valid for a period of six months. Position of not starting at all after the start of his resignation or allocated reserves of candidates will be called instead.

D) PLACEMENT POSITIONS TO BE

TITLE UNIT NUMBER
Afyonkarahisar Engineer 1
Agri Engineer 2
Amasya Engineer 2
Ardahan Engineer 2
Artvin Engineer 2
Bartin Engineer 3
Batman Engineer 2
Bayburt Engineer 2
Bilecik Engineer 2
Bingham Engineer 2
Bitlis Engineer 2
Bolu Engineer 2
Burdur Engineer 1
Chicago Engineer 2
Çankırı Engineer 1
Corum Engineers 2
Diyarbakir Engineer 3
Duzce Engineer 1
Edirne Engineer 3
Elazig Engineer 1
Erzincan Engineer 2
Erzurum Engineer 4
Gumushane Engineer 1
Hakkari Engineer 2
Hatay Engineer 1
Igdir Engineer 1
Isparta Engineer 2
Kahramanmaras Engineer 2
Karaman Engineer 1
Kars Engineer 2
Kastamonu Engineer 2
Kayseri Engineer 3
Kirikkale Engineer 3
Kirklareli Engineer 3
Kirsehir Engineer 1
Kilis Engineer 1
Mardin Engineer 3
Mugla Engineer 2
Mus Engineer 1
Nevsehir Engineer 3
Nigde Engineer 2
Osmanabad Engineer 1
Rize Engineer 1
London Engineer 1
Siirt Engineer 2
Sinop Engineer 1
Sivas Engineer 2
Sanliurfa Engineer 2
Sirnak Engineer 2
Tekirdag Engineer 4
Usak Engineer 2
Van Engineer 4
Yalova Engineer 2
Engineer 2 Yozgat
Zonguldak Engineer 1
TOTAL 107

E) APPOINTMENT UNDER DOCUMENTS

1) electronically signed and a photo example of the output of completed application form,

2) service agreement signed by the applicant,

3) Diploma or graduation certificate, original or notarized or certified copy of school,

4) Original or internet printout of the result document KPSS,

5) congenital or acquired for any reason, physical, mental, spiritual, social skills or sensory disability according to the state in terms of loss of all body functions, and over 40% disabled as to whether the written statement,

6) taken from the front in the last six months (4) passport size color photo,

7) Goods declaration statement,

8) Ethics agreement

Address and contact details

Ministry of Industry and Trade

Personnel Department

Sogutozu Eskisehir Road 7 Km.

No: 154 Kat: 9 Room No.: 920

Çankaya / ANKARA

Tel: 0 (312) 201 57 33-34

E-mail: sozlesmelipersonel@sanayi.gov.tr

Industry and Trade Specialist exam notice

The main service units of the Ministry of Industry and Commerce (the central organization) to be employed in general administration services category (25) One of Industry and Commerce Expert staff will be made for the entrance examination in Ankara between 17-21 January 2011.

T.C.

THE MINISTRY OF INDUSTRY AND TRADE

DEPUTY INDUSTRIAL AND TRADE EXPERT

ENTRANCE EXAMINATION ANNOUNCEMENT

The main service units of the Ministry of Industry and Commerce (the central organization) to be employed in general administration services category (25) One of Industry and Commerce Expert staff will be made for the entrance examination in Ankara between 17-21 January 2011.

Subject areas to be taken as the numerical distribution of Trade and Industry Assistant Experts are listed below.

At least four years of higher education institutions offering education;

* Political Science, Economics, Business Administration, and graduates of Faculty of Economics and Administrative Sciences (8),

* Law School graduates (8),

* If the graduates of faculties of Engineering;

(3) Civil Engineer,

(1) Electrical Engineer,

(2) Mechanical Engineer,

(1) Survey Engineer,

(2) Computer Engineer for a total of (9),

A) TERMS OF PARTICIPATION EXAM:

1) the Civil Servants Law No. 657 of the first paragraph of Article 48 paragraph (A) the general conditions of the move,

2) at least a four-year universities of higher education institutions, law, political science, economics, business and engineering schools and faculties of economics and administrative sciences, construction, electrical, mechanical, maps and computer engineering departments or abroad whose equivalence is accepted by the Board of Higher Education high have graduated from educational institutions,

3) ÖSYM of 2010 we made 27 to 28 June 2009 or July 10 to 11 Public Personnel Selection Examination (KPSS);

Political Science, Economics, Business Administration, Faculty of Economics and Administrative Sciences KPSS P73 for graduates,

KPSS P97 for graduates of the Faculty of Law,

KPSS P3 for graduates of engineering faculties,

points of type (75) or be taken over the points,

4) English, French or German language, or later in the year 2006 Public Personnel Language Exam (TOEFL) or equivalent examinations at least (C) level to be successful,

5) on 01/01/2011 to be below the age of thirty,

B) APPLICATION FORM, PLACE, TIME AND OTHER MATTERS:

1) Applications no later than 23:59 hours on 24 December 2010 up to the internet from the Ministry www.sanayi.gov.tr is done electronically. The applications will be accepted by mail or in person, have sought not in terms of quality and missing documents and the winners qualify for the examination of those applications will not be considered.

2) print out the application form will be stored in electronic form filled out and signed this form, candidates are eligible to participate in the examination and an example of a photograph, along with other documents shall be submitted to Ministry before the exam.

3) The name list of candidates eligible to participate in the exam with the exam date, place and time, on December 28, 2010 at the latest announcement of the Ministry and the Ministry www.sanayi.gov.tr board will be announced at the internet address is bulunulmayacaktır any notice to candidates to attend the exam.

4) the test, candidates are to be used in identification, a certified photograph and identity document (identity card, driving license, etc.). Keep in required. Otherwise, ignore the candidates take the exam.

5) Introduction to the application documents, misrepresentation examination determined that the winners of those exams and assignments and is void. This is about people bulunulur Chief Public Prosecutor filed a criminal complaint. The Ministry of the organizations they work yanıltanlar public official shall be notified of the situation.

C) TYPE OF EXAM, AND EVALUATION OF TOPICS:

1) Introduction of an oral exam will be held at one stage. Conditions of participation and participation with the candidates applying for the exam, the KPSS scores for each type of group than the one with the most points will be started on branches of learning as a result of sorting up to four times the number of staff will be nominated for appointment (the last row candidates, including candidates who have the same score, KPSS) to participate in the examination will be eligible. Engineering graduates of faculties of engineering branch of the rankings for each separately identified and will be made on the basis of the number of staff shown above.

2) Input exam, candidates for graduation information on the following levels depending on the situation, understanding, reasoning, expression, ability, attitude, personal qualities, such as the ability to act and represent the Commission for Examination eligibility will be evaluated in terms of the task.

A) INFORMATION ON POLITICAL, ECONOMIC, BUSINESS AND ECONOMICS AND ADMINISTRATIVE SCIENCES GROUP:

* The main field, Micro Economics, Macro Economics, Industrial Economics, International Economics, Development-Growth, Turkey Economy, Business Economics, Business Administration and Policy, Public Finance,

* The secondary field; Constitutional Law, Administrative Law, Civil Law General Provisions General Provisions of the Law of Obligations, Commercial Business Law and Corporate Law,

B) LAW GROUP:

* The real space; Constitutional Law, Administrative Law and Administrative Procedure Law, Criminal Law, Misdemeanors Law, Civil Law General Provisions person 'Law, Property Law, General Principles of Law of Obligations, Commercial Business Law and Corporate Law,

* The secondary field, Micro Economics, Macro Economics, Turkey Economy, Business and Management and Policy, Public Finance.

C) ENGINEERING GROUP:

* The main field, Mathematics, Physics, Chemistry,

* The secondary field, Micro Economics, Macro Economics, Turkey Economy, Business and Management and Policy, Public Finance, Basic Law Information.

3) the group of Engineering (civil, electrical, mechanical, maps, computer) examination candidates who qualify to participate in oral examination as part of the 09:30 hours on Monday 17 January 2011 in the subjects of the original (mathematics, physics and chemistry) are those tested and the actual candidates The topics of the Mathematics, Physics and Chemistry from each of the areas (10) 'for a total of R units (30) questions the test will be applied.

4) The examination commission, the members of each island (100) separately on the scores awarded full marks the candidate's exam score is determined by taking the arithmetic average and a minimum of (70) points and taking notes on the candidates considered to have been successful. Exam score is determined on the basis of entrance exam score and the final achievement of success by ranking the groups (for candidates who graduated from the faculties of engineering in each branch of engineering) is done separately. Exam scores of foreign language score higher in the case of equal priority shall be given to the island. As a result of this sort by the number of staff specified in the announcement of the winners of each group to test the backup candidate is determined by the number of staff.

5) Examination results will be declared the site of the Ministry www.sanayi.gov.trinternet with bulletin board. Exam candidates and substitute as the winner is notified in writing prior to assignment. Candidates, Industry and Trade Specialist staff are appointed according to the order of success. Spare the rights of candidates was announced exam results are valid for three months from the date. During this time, the assignment will be assigned in order of success in reserve in case of discharge of the occupying them.

D) exam candidates, who acquired PARTICIPATION RIGHTS DOCUMENTS:

1) a signed application form filled out electronically and print out a photograph,

2) Higher education or school diploma or graduation certificate, original or notary certified copy,

3) the original or a print out the result document KPSS,

4) TOEFL or an equivalent document, the original or a print out results of examinations,

5) Ministry's web site according to the format as published in the history of the candidate's own handwriting with self-post.

Announced to the public.

Regarding examination (0312) 201 57 47, 48, 49, 54, 59 may be further information telephone number.