Turkey land delivery - Fashion - Style - Trendy

Sunday, December 12, 2010

Turkey land delivery

Some of the roads due to heavy snowfall and type of transportation will be closed.

Directorate General of Highways in a written statement, Dumlupinar-Altintas, Aksehir-Tuzlukçu-Yunak, Cat-Karliova access roads will be closed due to snow and type were reported.

22-44 Ikizdere-Ispir way. Mountain district, between kilometers Ovit the snow, the type and between the hours of 17:00 to 07:00 due to avalanche danger in terms of life and property safety of road transport needs to close.

Trabzon-Rize road 27 kilometers (Arakli Tunnel POSITION) Arakli way to pass the city link road transportation due to mechanical loading gauge assembly work by closing the service road transportation is provided.

Silifke-Anamur road 23-28. kilometers between the (village, firing position) between the hours of 13:00 to 16:00 tomorrow blasting access road will be closed due to road construction work.

Macka-Torul path 2 Tunnel maintenance and cleaning work Zigana kilometers between the hours of 7:00 a.m. to 5:00 p.m. due to a single lane controlled access is given.

0-26 Partners-Soke-Milas road. between kilometers (Karacabel POSITION Tunnel) due to road construction blasting Tuesdays, Wednesdays and Thursdays between the hours of 1:00 p.m. to 5:00 p.m. to close access to short-term intervals.

Giresun-Trabzon Tirebolu-2 on the way Junction Bridge Tunnel and the electro-mechanical studies Tirebolu-Doğankent between the hours of 08:30 to 17:30 due to road traffic by closing the passage to be provided transportation Tirebolu city.

TEM Motorway and the West Jetty Language Hereke bridge superstructure repair work due to road junctions between the various sections 5 to 25 December 2010 between the hours of 22:00 to 6:00 during the trials Plain Language bookies are completely closed to vehicular traffic, transport in the opposite direction will be given round-arrival.

Anatolian Motorway Junction-Gerede Çeltikçi lighting and road information between Junction 30 November 2010 to 31 December 2010 for his work between the hours of 07:00 to 19:00 between the left lane closed to traffic control will be provided access to other strips.

Anatolian Motorway Tolls-TAİ Junction between Raiders (36-37. Kilometers between) until December 31 because of the asphalt pavement repair work will be given access to a single lane.

Ankara-Bala to Kulu separation-separation 20-25 pathway. kilometers due to the paving work until December 17 as a two-way transportation will be provided from one part of the divided road.

Willow-Korkuteli-Antalya road 9-11. due to blasting of kilometers of road construction works Mondays, Wednesdays and Fridays between the hours of 14:00 to 16:00 will be closed to road transport.

Partners-Soke-Milas road 57-61. kilometers (Lake) because of the ongoing road construction blasting Tuesdays, Wednesdays and Thursdays between the hours of 1:00 p.m. to 17:00 will be provided as a controlled access road closed to traffic periodically.

Gokova Marmaris road 20-21. kilometers (Stockton-out position) due to road construction blasting Wednesdays and Saturdays between the hours of 13:00 to 15:00 access road will be closed periodically.

Milas-Yata 4-19 road. between kilometers (Kozağaç, Boğayokuşu and Karaltı positions) due to road construction blasting between the hours of 2:00 p.m. to 4:00 p.m. Tuesdays and Thursdays at controlled access road closed to traffic will be provided short-term intervals.

0-29 Menemen-Manisa road. I pop the road because of kilometers of road construction work between the hours of 2:00 p.m. to 17:00 every day, close to transportation.

4-7 Hasankeyf-Gercus way. until Dec. 31 due to blasting of kilometers of road construction work and blasting be made every day between 24.00-06.00 hours on days two days a week between the hours of 12:00 to 15:00 will be closed to road traffic.

Due to the construction of asphalt road Torul Tirebolu-way traffic between the hours of 18.00-24.00 for vehicles waiting to be closed to traffic between the hours of 20:00 to 20:15 22:00 to 22:15 with the given transition.

The statement, roads construction, maintenance and repair work carried out parts of the slow-go, traffic signs and beacons complied, chains, wedges, and kept in tow, excessive rainfall regions were asked to be wary of sudden events, landslide and subsidence.

No comments:

Post a Comment