Istanbul Metropolitan Municipality Disaster Coordination Center (AKOM), according to a written statement from the 2011 winter season, plans to combat adverse weather conditions have been reviewed.
In winter, bad weather conditions for continuation of the normal course of life of the city, struggling with the work of snow-ice and standing water assessment, planning and coordination meeting was held AKOM'da.
Secretary General of Istanbul Metropolitan Municipality held a meeting chaired by Deputy Secretary-General Muzaffar Hacımustafaoğlu Baştürk Adam, General Manager Hayri Baraçlı IETT, department heads, ISKI, BEDAŞ, Istanbul Metropolitan Municipality representatives of the company, the directors, joined the Istanbul Police Department and Highways Regional Office officials.
Adverse weather conditions of the struggle within the framework of preparations for the meeting, 43 Find the first priority route to a total of 2 255 833 thousand squares kilometers of road network and evaluated the work schedule.
Accordance with the decisions taken at the meeting, the Istanbul Metropolitan Municipality Directorate of Road Maintenance and repair depots even though there were 154 thousand 82 tons of salt in case the weather conditions expected to pass more stringent than the order was made 60 thousand tons of salt.
County municipalities in the case of salt supplementation needs to be done. 1800 tons ready solution is pending on 82 separate locations. Directorate of Road Maintenance and repair of production facilities in case of need to be done.
Each region identified priority routes, stations, creating, rainfall and rainfall during pre-main arteries, participation points, junctions, and E-5 highway so as to interfere with the preparations have been completed.
Outside of the main arteries, squares, upper and lower walkways, ferry docks, bus stops, entrance and exit of the hospital, universities and schools for entrance and exit of the snow-fighting team was created.
During the meeting, under adverse weather conditions in Istanbul the studies were divided into nine regions.
Karla-LATEST MODEL-FIGHTING VEHICLES
772 vehicles and construction equipment along with weather conditions ağırlaşmasıyla, 3 thousand 343 personnel will be struggling with.
Istanbul Metropolitan Municipality in all measures to spend a winter without any problems, the last model to use snow-fighting vehicles and early warning systems.
Vehicles, and road-opening work of the Clearing Will Do routes, with existing vehicle tracking system to be followed AKOM'dan, if necessary, vehicles will be redirected to other areas.
Icing will be the route of intervention studies, 255, 3 hours in advance to be determined and informed the teams. 45 minutes after first notifying the referral and will be managed within the teams. Waste of time and denied the use of unnecessary material.
Park Gardens Management teams to take part in public squares and pedestrian crossings.
IETT, metrobus way to make snow-fighting efforts.
Critical junctions 21 and engaging in rescue, stays on the road and accident potential bekletilecek ready.
Hospitals, universities, bus stops and profit Kurumi sub-teams, created specifically for the upper gates.
Weather conditions at risk of life-event of minus 4 degrees, the citizens living on the streets scheduled for collection centers. Citizens, police, police, ambulances and maintenance will be collected, sports halls or hotels things to guests.
-Flew-ROOF
Meanwhile, heavy rain started last night with the effective strength of the storm, Robert, Sergeant Knight blew the roof of a building in the District Bridgehead Road. Police and firefighters around the security measures, while the panic of the residents lived in the street.
Job İslambey Street on the fallen tree due to wind weft Street efficient small-scale damage to property caused by parked cars. As a result of the intervention of fire crews cut the fallen tree was removed.